Competence in boiler and apparatus construction

In power plant construction, and particularly in waste incineration systems, boiler walls, collectors and convection heating surfaces are subject to strong abrasion by aggressive flue gases.
 
Cladding is a process in which a high-alloyed special steel is deposit-welded onto the base material for surface protection. State-of-the-art automatic welding machines with pulse welding as well as CMT welding procedures are used both in surface and in radial cladding.